Nasıroğlu Yol Yapım Nasıroğlu Yol Yapım Nasıroğlu Yol Yapım

Asphalt · Infrastructure · Paving

Asphalt is
our business.

Paver-laid asphalt, milling, robotic patching, paving stone and kerb work, and infrastructure. Free site visit, same-day quote.

/03

13

Service Lines

7/24

Visits & Support

Same Day

Quote

In-house

Equipment Fleet

02 Free tool

How many tonnes of asphalt?

Enter the area and layer thickness to get tonnage, compacted volume, truck count and tack coat instantly. Send the result to us on WhatsApp with one tap.

How will you enter the area?

Surface layer · 4–5 cm recommended

Advanced settings +

Estimated asphalt required

tonnes

Waste allowance included

m³ compacted volume

trucks (approx.)

kg / m²

kg tack coat

Results are approximate; they vary with subgrade condition, gradient and compaction rate. Exact quantities are set during the free site visit.

Wearing course

4–5 cm

The visible surface layer that carries traffic.

Binder

5–7 cm

Intermediate layer distributing load between wearing course and base.

Bituminous base

7–10 cm

The lower load-bearing layer under heavy traffic.

03 How we work

Four steps on site

1

Site visit

We walk the site and assess the subgrade and drainage on the spot. Free of charge.

2

Take-off

Tonnage, equipment and duration are worked out from the area and layer thickness.

3

Quote

A written, itemised quote with no surprise entries — usually the same day.

4

Execution

Milling, tack coat, laying and roller compaction; the road reopens fast.

Shall we set a date for the site visit?

Free site visit

Tell us the square metres, we will work out the price.